On the morning of September 14, Hou Junping, Secretary of the Party Committee of Qilu Hospital, Han Hui, Vice President of the hospital, and Zhang Wanmin, Leader at Vice Presidential level led to investigate the renovation and reconstruction of the Kaiwen Building on the spot. Leaders of the Office of Party Committee, the Department of State-owned Assets, the Outpatient Department, the Security Department, the Information Network Center, the Logistics Department, the Reproductive Medicine Center, the Department of Poisoning and Occupational Disease Department, the Department of Urology, the Department of Ophthalmology, and investment company also participated in the investigation.
Leaders inspected the laboratory of the Reproductive Center on the tenth floor, the outpatient clinic of the Reproductive Center on the ninth floor, the operating room of the Reproductive Center on the sixth floor, the ward area of the Department of Poisoning and Occupational Disease on the fourth floor, the Kidney Stone Center on the third floor and the Optometry Center on the second floor. They listened to the report given by people in charge of the project, and learned about the progress of the reconstruction.
Hou Junping put forward specific requirements on production safety, project quality, project progress, and department cooperation. He pointed out that all relevant departments should cooperate closely, and intervene in advance as soon as possible to accelerate the progress of the project. Hou Junping emphasized that the unit and relevant persons in charge must adhere to high-standard requirements, high-quality promotion, and high-level management, go all out to speed up the construction of the project, complete the project with high quality and on schedule under the premise of safety production, and relocate at the end of the month.
The office meeting emphasized that the renovation project is an important measure for the hospital to practice the "two dignity" concept, improve the diagnosis and treatment environment for some departments, and make patients more satisfied. All relevant units must raise awareness, build consensus, be responsible, and cooperate with each other to make sure the project be completed on time and with high quality.